191208 | Consultation: Implementation of traffic calming measures along the B3280 through Townshend
Background:
Concerns
have been raised about the speed of traffic through Townshend. In
particular there are concerns about access and egress from the road to
the adjacent properties and connectivity concerns within in the village
as there is a fear of walking along the road.
Scheme Objectives
Preliminary
design work has identified a number of traffic calming measures that
can be implemented through the village. It is anticipated that these
measures will have the effect of reducing traffic speeds through the
village:
• New gateway features at the existing 30mph terminals
at both ends of the village. This include wood-effect gateways,
“dragon’s teeth” and 30 roundel road markings.
• Priority “give way” build outs at three locations in the village. These will include bypasses for cyclists.
• Build outs in the vicinity of “The Firs” that will locally narrow the carriageway
• Removal of the centre line in the vicinity of “Treloweth”
via https://www.engagespace.co.uk/cornwall/consultation_Dtl.aspx?consult_Id=...
Contributions
- Angarrack Defibrillator Team (25)
- Angarrack Inn (336)
- Angarrack Methodist Chapel (3)
- Carol (15)
- Gail (1)
- GordonG (12)
- Hayle Development Group on Facebook (5)
- Hayle Harbour Authority (4)
- Hayle Town Council (5)
- louise (1)
- Lynne (94)
- Mal (1)
- Neil (22)
- Neils Garden Care (9)
- Russell (21)
- Secretary - Christmas Lights (118)
- Steve (3)
- webmaster (5020)
Page
Similar
- 191120 | Consultation: Changes to waiting restrictions on various streets in Hayle, Connor Downs, Lelant and Reawla (Wall).
- 190208 | Connor Downs resurfacing works road closure extended - Gwinear-Gwithian Parish Council
- 170807 | St Erth roundabout A30 section to be restricted to 30mph limit for eight months | Cornwall Live
- 170622 | Grigg’s Quay, Lelant – LATEST | Hayle development discussion group FB
- 160912 | Parish Council Meeting – Minutes 12-Sept-2016 - Gwinear-Gwithian Parish Council
Similar across site
- 191208 | Consultation: Implementation of traffic calming measures along the B3280 through Townshend
- 191120 | Consultation: Changes to waiting restrictions on various streets in Hayle, Connor Downs, Lelant and Reawla (Wall).
- 190208 | Connor Downs resurfacing works road closure extended - Gwinear-Gwithian Parish Council
- 170807 | St Erth roundabout A30 section to be restricted to 30mph limit for eight months | Cornwall Live
- 170622 | Grigg’s Quay, Lelant – LATEST | Hayle development discussion group FB